Skip to content

Marathon, Monroe County

Demolition in Marathon

Marathon is where Hurricane Irma took out whole trailer communities, and demolition here still has that stamp. The city has its own building department, its own portal and an asbestos affidavit that must be signed and notarized before demolition or renovation work.

A rapid damage survey after Irma found that building type and size mattered most in Marathon, and described the near-complete destruction of its trailer communities. That is why mobile home removal belongs on this page, and why a lot may hold old and rebuilt structures side by side. We survey each one for asbestos and for what the storm left behind before we price.

The city takes permits through an online portal, posts building scheduling hours of 9 a.m. to 4 p.m. on weekdays, and lists a FEMA compliance inspection form and an abandonment affidavit among its forms. Its commercial checklist asks for proof of septic abandonment and proof of connection to the city wastewater system, a reminder that sewer and septic status drives the file.

Debris from Marathon goes north. The franchise hauler for the stretch from Seven Mile Bridge to about mile marker 72.5 is Marathon Garbage Service, and everything that leaves the Keys travels by truck to the mainland. We plan loads and routes before mobilizing.

Sources: Rapid assessment of damaged residential buildings, Big Pine Key and Marathon after Irma · Keys News: where Monroe County's waste goes

Getting the permit in Marathon

City of Marathon Building Department

Permits are submitted, reviewed and issued through the city's online portal. The city's forms include an asbestos affidavit that must be signed and notarized for demolition or renovation work, and owner-builders must apply in person. Some forms are older, so confirm the current ones.

Read the source

This is general information and not legal advice. If you hire us, we file the permit ourselves as the contractor on record. Monroe permit guide

What we quote in Marathon

Kinds of demolition we quote here

From first call to final

Six stages, always in this order

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A shed and a full building go through these same stages.

  1. Send the address and the scope

    Phone us or fill in the quote form. Say which key it is on, what must come down and what must stay.

  2. A visit to the lot

    Someone from Romco goes to the property. The building, the flood zone, the utility connections, the way equipment and trucks get in, and the neighboring lots all get a look.

  3. The written quote

    You get a document listing what comes out, what is kept safe, and what is trucked north off the island chain. Anything that hangs on survey results is marked as such.

  4. Paperwork before machines

    If asbestos testing applies, it happens here. So do the utility shutoffs and the filing of your demolition permit with whichever office covers the parcel.

  5. Demolition and haul-off

    The crew works through the agreed order. Debris is trucked to permitted facilities, and we keep the load records.

  6. Final inspection

    The permit office signs off after its last inspection. You are left with a cleared lot, or the shell you specified.

Questions

Demolition in Marathon

What does Marathon ask for on asbestos before a demolition?

The city's permit materials call for an asbestos affidavit, signed and notarized, for renovation or demolition work, and point owners to the state environmental office where asbestos is present. Confirm the current form with the building department.

What does a demolition cost in the Keys?

A quote follows a visit to the property, or a review of photos and drawings when those show enough. The figure moves with the building's materials and height, the asbestos survey, the utility disconnects, how equipment reaches the lot, and the haul, because everything leaves the island chain by truck. We do not publish prices, since two lots that look alike seldom cost alike.

How is asbestos handled before a demolition?

An independent licensed consultant surveys the building first, because the federal asbestos rule calls for a thorough inspection before a regulated demolition and the state notice depends on it. Should the survey turn up asbestos that the job would disturb, a separately licensed abatement firm takes it out. Romco books and sequences both visits, but abatement is not work we perform.

How long before a Keys demolition can start?

No one can name a date until the facts are known. The start depends on how fast your permit office reviews the file, when the utility letters arrive, the asbestos survey and the notice that follows it, any flood-zone or habitat review, the weather, and the building itself. When those are settled we send you the order of work and what each step waits on.

Other Monroe cities: Key West · Stock Island · Islamorada · Key Largo · Ocean Reef · Tavernier · Duck Key · Key Colony Beach · Big Pine Key · Cudjoe Key · Summerland Key · Ramrod Key · Big Coppitt Key

Any type, any size, anywhere in the Keys

Tell us where it is and what has to come down. We will price it.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. From a single wall to a full building, you receive a written scope and a quote.

Call (239) 510-4206Request a quote