Skip to content

Cudjoe Key, Monroe County

Demolition in Cudjoe Key

Cudjoe Key issues no building permits of its own, so the county does. It is also where the county's Lower Keys transfer station sits, at about mile marker 21.5 on Blimp Road, which gives a Cudjoe Key job a different haul story from Key West.

The transfer station at Cudjoe Key is one of the county's two public drop-off sites, with its sister at Long Key. The county sends the trash, yard waste and recycling from both to the mainland, because nothing is processed in the Keys. A homeowner clearing a small shed might use it. A contractor hauling demolition debris uses a licensed hauler, and we confirm what the facility accepts before a load goes there.

Many lots on Cudjoe Key are on canals or the water, with houses raised on pilings and storage below. A raised house leaves a pile field and sometimes a slab behind it, and removing those takes planning near the water table.

Because the key is unincorporated, a demolition is permitted by the Monroe County Building Department, with the Big Pine Key and Stock Island offices nearest. We confirm the office and the hours before anyone makes the drive.

Sources: Monroe County Solid Waste · Keys News: where Monroe County's waste goes

Getting the permit in Cudjoe Key

Monroe County Building Department

The county issues permits for Cudjoe Key. The county takes applications through its online permitting system, where applicants must register first, and publishes its office hours as 8:30 a.m. to 3 p.m. at each permitting office, with appointments encouraged. Check the current checklist for your parcel before filing.

Read the source

This is general information and not legal advice. If you hire us, we file the permit ourselves as the contractor on record. Monroe permit guide

What we quote in Cudjoe Key

Kinds of demolition we quote here

From first call to final

Six stages, always in this order

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A shed and a full building go through these same stages.

  1. Send the address and the scope

    Phone us or fill in the quote form. Say which key it is on, what must come down and what must stay.

  2. A visit to the lot

    Someone from Romco goes to the property. The building, the flood zone, the utility connections, the way equipment and trucks get in, and the neighboring lots all get a look.

  3. The written quote

    You get a document listing what comes out, what is kept safe, and what is trucked north off the island chain. Anything that hangs on survey results is marked as such.

  4. Paperwork before machines

    If asbestos testing applies, it happens here. So do the utility shutoffs and the filing of your demolition permit with whichever office covers the parcel.

  5. Demolition and haul-off

    The crew works through the agreed order. Debris is trucked to permitted facilities, and we keep the load records.

  6. Final inspection

    The permit office signs off after its last inspection. You are left with a cleared lot, or the shell you specified.

Questions

Demolition in Cudjoe Key

Can I take demolition debris to the Cudjoe Key transfer station?

The county runs a transfer station there for household waste, yard waste and recycling. Whether it accepts demolition debris, and at what cost, is for the county solid waste office to say. A contractor job normally uses a licensed hauler.

What does a demolition cost in the Keys?

A quote follows a visit to the property, or a review of photos and drawings when those show enough. The figure moves with the building's materials and height, the asbestos survey, the utility disconnects, how equipment reaches the lot, and the haul, because everything leaves the island chain by truck. We do not publish prices, since two lots that look alike seldom cost alike.

How is asbestos handled before a demolition?

An independent licensed consultant surveys the building first, because the federal asbestos rule calls for a thorough inspection before a regulated demolition and the state notice depends on it. Should the survey turn up asbestos that the job would disturb, a separately licensed abatement firm takes it out. Romco books and sequences both visits, but abatement is not work we perform.

How long before a Keys demolition can start?

No one can name a date until the facts are known. The start depends on how fast your permit office reviews the file, when the utility letters arrive, the asbestos survey and the notice that follows it, any flood-zone or habitat review, the weather, and the building itself. When those are settled we send you the order of work and what each step waits on.

Other Monroe cities: Key West · Stock Island · Marathon · Islamorada · Key Largo · Ocean Reef · Tavernier · Duck Key · Key Colony Beach · Big Pine Key · Summerland Key · Ramrod Key · Big Coppitt Key

Any type, any size, anywhere in the Keys

Tell us where it is and what has to come down. We will price it.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. From a single wall to a full building, you receive a written scope and a quote.

Call (239) 510-4206Request a quote