Big Coppitt Key, Monroe County

Demolition in Big Coppitt Key

Big Coppitt Key is the gateway to Geiger Key, and it connects by railroad fill to Shark Key, a private gated community developed in the 1980s. A demolition in Big Coppitt can mean an ordinary canal lot, or a lot behind a gate with its own rules.

Elevated canal-front homes are common across Big Coppitt and Geiger Key. A raised house on pilings with a ground-level garage or storage leaves deep pilings behind, in a wet lot. Romco self-performs dewatering and deep foundation work, which applies when the piles come out below the water table.

Shark Key is linked to Big Coppitt by old railroad fill and is a private community. An association may control gate access, truck times and routes. We ask for those rules and for any approval the association requires before we price.

The key is unincorporated, and Monroe County lists a permitting office on Stock Island, the nearest to Big Coppitt. Confirm the office and hours before filing.

Sources: Keys Weekly: Shark Key, Big Coppitt and Geiger

Getting the permit in Big Coppitt Key

Monroe County Building Department, Stock Island office

Big Coppitt Key, Geiger Key and Shark Key are unincorporated. The county takes applications through its online permitting system, where applicants must register first, and publishes its office hours as 8:30 a.m. to 3 p.m. at each permitting office, with appointments encouraged. Check the current checklist for your parcel before filing.

Read the source

This is general information and not legal advice. If you hire us, we file the permit ourselves as the contractor on record. Monroe permit guide

What we quote in Big Coppitt Key

Kinds of demolition we quote here

From first call to final

Six stages, always in this order

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A shed and a full building go through these same stages.

  1. Send the address and the scope

    Phone us or fill in the quote form. Say which key it is on, what must come down and what must stay.

  2. A visit to the lot

    Someone from Romco goes to the property. The building, the flood zone, the utility connections, the way equipment and trucks get in, and the neighboring lots all get a look.

  3. The written quote

    You get a document listing what comes out, what is kept safe, and what is trucked north off the island chain. Anything that hangs on survey results is marked as such.

  4. Paperwork before machines

    If asbestos testing applies, it happens here. So do the utility shutoffs and the filing of your demolition permit with whichever office covers the parcel.

  5. Demolition and haul-off

    The crew works through the agreed order. Debris is trucked to permitted facilities, and we keep the load records.

  6. Final inspection

    The permit office signs off after its last inspection. You are left with a cleared lot, or the shell you specified.

Questions

Demolition in Big Coppitt Key

Does a gated community like Shark Key add steps to a demolition?

Usually, yes. The association often controls gate access, truck routes and working hours, and may require its own approval. Ask for the rules before you set a schedule.

What does a demolition cost in the Keys?

A quote follows a visit to the property, or a review of photos and drawings when those show enough. The figure moves with the building's materials and height, the asbestos survey, the utility disconnects, how equipment reaches the lot, and the haul, because everything leaves the island chain by truck. We do not publish prices, since two lots that look alike seldom cost alike.

How is asbestos handled before a demolition?

An independent licensed consultant surveys the building first, because the federal asbestos rule calls for a thorough inspection before a regulated demolition and the state notice depends on it. Should the survey turn up asbestos that the job would disturb, a separately licensed abatement firm takes it out. Romco books and sequences both visits, but abatement is not work we perform.

How long before a Keys demolition can start?

No one can name a date until the facts are known. The start depends on how fast your permit office reviews the file, when the utility letters arrive, the asbestos survey and the notice that follows it, any flood-zone or habitat review, the weather, and the building itself. When those are settled we send you the order of work and what each step waits on.

Other Monroe cities: Key West · Stock Island · Marathon · Islamorada · Key Largo · Ocean Reef · Tavernier · Duck Key · Key Colony Beach · Big Pine Key · Cudjoe Key · Summerland Key · Ramrod Key

Any type, any size, anywhere in the Keys

Tell us where it is and what has to come down. We will price it.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. From a single wall to a full building, you receive a written scope and a quote.

Call (239) 510-4206Request a quote